High tensile zinc plated Truck Wheel Hub Bolt and Nut
1. Material: Grade 12.9 carbon steel or Grade 8.8 carbon steel
2. Surface treatment: zinc plated
3. USE: Cars, Trucks
Bailian Hardware Limited, custom making all kinds of OEM and ODM service bolts and nuts, Stamping and CNC parts. If you have any needs, we also have special engineer team that can help giving you suggestions. Any require, welcome for consult
Truck Wheel Hub Bolt and Nut
1.Specifications
Products |
Truck Wheel Hub Bolt and Nut |
Using Local |
Cars, Trucks |
Material: |
Grade 12.9 carbon steel or Grade 8.8 carbon steel |
Surface Treatment |
zinc plated |
MOQ |
1000 pcs |
Size |
Expect Standard Bolts and Nuts part, other parts need you provide with your Own Drawing. This kind of shaft better send us with your own 3D drawing for in case in the making |
Quality Policy |
All the parts manufactured 100% inspection from OQC before shipping. |
Sample |
Sample before goods need sample cost, also with the Mold cost; Pre-production sample didn't need sample cost, but count in goods cost |
Packaging |
Normal packing, then put in a box, and with Pallet (Custom packing ways accept, if you have this kind of needs, let me know) |
Lead time |
Need at least 30 days for goods production |
2. Production Process
3. Inspection
4.About Our Company:
Shenzhen Bailian Hardware Co., Ltd. is a professional foreign import and export trading company which was founded on the basis of integrating advantages of many enterprises.
With imported automatic lathes,CNC lathes,CNC machining centers,stamping machines and cold heading machines,also the strict quality management system,we keep improving our product quality and finding most fitting fastening solution to help our customers for one-stop buying with the optimum cost of maximum flexibility.
5.FAQ:
1. Q: How could you ensure the quality of your product?
A: 100% inspection during production.
Our products are certified to ISO9001, RoHS international quality standards.
2. Q: What's the delivery time?
A: General speaking the time is 15-30 days after confirmed every details.
3. Q: What's your packing?
A: Usually PE bag,Small box,Plasitc box .
We also can pack products according to your requirement.
Welcome for any consult, also welcome to come to our factory visit, third party checking with our factory also welcomed