Drive transmission shaft
1. Material: Flywheel Aluminum 7075, Gear is steel
2. Surface treatment: Flywheel anodized, Gear Harden and Oil
3. USE: Bicycle, Car, Motor Bike, Boats and so on.
Bailian Hardware Limited, custom making all kinds of OEM and ODM service bolts and nuts, Stamping and CNC parts. If you have any needs, we also have special engineer team that can help giving you suggestions. Any require, welcome for consult
Flywheel and Gear
1.Specifications
Products |
Flywheel and Gear |
Using Local |
Yacht and ETC |
Material: |
Flywheel Aluminum 7075, Gear is steel |
Surface Treatment |
Flywheel anodized, Gear Harden and Oil (Please suggest which you need) |
Manufacturing Method |
powder metallurgy for Gear, CNC machining for Flywheel |
Size |
Expect Standard Bolts and Nuts part, other parts need you provide with your Own Drawing. This kind of shaft better send us with your own 3D drawing for in case in the making |
Quality Policy |
All the parts manufactured 100% inspection from OQC before shipping. |
Sample |
Sample before goods need sample cost, also with the Mold cost; Pre-production sample didn't need sample cost, but count in goods cost |
Packaging |
Copy paper packing, then put in a box, and with Pallet |
Lead time |
Need at least 40 days for goods production |
3. Inspection
4.About Our Company:
Shenzhen Bailian Hardware Co., Ltd. is a professional foreign import and export trading company which was founded on the basis of integrating advantages of many enterprises.
With imported automatic lathes,CNC lathes,CNC machining centers,stamping machines and cold heading machines,also the strict quality management system,we keep improving our product quality and finding most fitting fastening solution to help our customers for one-stop buying with the optimum cost of maximum flexibility.
5.FAQ:
1. Q: How could you ensure the quality of your product?
A: 100% inspection during production.
Our products are certified to ISO9001, RoHS international quality standards.
2. Q: What's the delivery time?
A: General speaking the time is 15-30 days after confirmed every details.
3. Q: What's your packing?
A: Usually PE bag,Small box,Plasitc box .
We also can pack products according to your requirement.
Welcome for any consult, also welcome to come to our factory visit, third party checking with our factory also welcomed
WhatsAPP
Wechat