CN
PRODUCT

Stainless steel Torx Wrench with Bolt

Stainless steel Torx Wrench with Bolt


1. Material: Stainless steel

2. Surface treatment: Nickel plated

3. USE: Lock, Safety 


Bailian Hardware Limited, custom making all kinds of OEM and ODM service bolts and nuts, Stamping and CNC parts. If you have any needs, we also have special engineer team that can help giving you suggestions. Any require, welcome for consult

Inquiry Now
  • /include/upload/kind/image/20190326/20190326175050_0450.jpg
  • /include/upload/kind/image/20190326/20190326175050_0450.jpg
  • /include/upload/kind/image/20190326/20190326175050_0450.jpg

Stainless steel Torx Wrench with Bolt

1.Specifications

Products
Stainless steel Torx Wrench with Bolt

Using Local

For safety lock, wheel lock, bicycles
Material:
Stainless steel (carbon steel and other material need to suggest)
Surface Treatment
Plain or nickel plating
Head Size
T20, (Stock size we have T5-T20)
Quality Policy
All the parts manufactured 100% inspection from OQC before shipping.
Sample
Sample before goods need sample cost,; Pre-production sample didn't need sample cost
Packaging
Normal packing, then put in a box, and with Pallet (Custom packing ways accept, if you have this kind of needs, let me know)
Lead time
Need at least 15 days for goods production

2. Production Process

3. Inspection

4.About Our Company:

Shenzhen Bailian Hardware Co., Ltd. is a professional foreign import and export trading company which was founded on the basis of integrating advantages of many enterprises.

With imported automatic lathes,CNC lathes,CNC machining centers,stamping machines and cold heading machines,also  the strict quality management system,we keep improving our product quality and finding most fitting fastening solution to help our customers for one-stop buying with the optimum cost of maximum flexibility.


5.FAQ:

1. Q: How could you ensure the quality of your product?

A: 100% inspection during production.

Our products are certified to ISO9001, RoHS international quality standards.


2. Q: What's the delivery time?

A: General speaking the time is 15-30 days after confirmed every details.


3. Q: What's your packing?

A:  Usually PE bag,Small box,Plasitc box .

We also can pack products according to your requirement.


Bailian Hardware Limited, Welcome for any consult, also welcome to come to our factory visit, third party checking with our factory also welcomed

RELATED PRODUCTS