CN
PRODUCT

Truck Wheel Hub Bolt and Nut

High tensile zinc plated Truck Wheel Hub Bolt and Nut


1. Material: Grade 12.9 carbon steel or Grade 8.8 carbon steel

2. Surface treatment: zinc plated

3. USE: Cars, Trucks


Bailian Hardware Limited, custom making all kinds of OEM and ODM service bolts and nuts, Stamping and CNC parts. If you have any needs, we also have special engineer team that can help giving you suggestions. Any require, welcome for consult

Inquiry Now
  • /include/upload/kind/image/20190326/20190326162220_2567.jpg
  • /include/upload/kind/image/20190326/20190326162220_2567.jpg
  • /include/upload/kind/image/20190326/20190326162220_2567.jpg

Truck Wheel Hub Bolt and Nut


1.Specifications

Products
Truck Wheel Hub Bolt and Nut
Using Local
Cars, Trucks
Material:
Grade 12.9 carbon steel or Grade 8.8 carbon steel
Surface Treatment
zinc plated
MOQ
1000 pcs
Size
Expect Standard Bolts and Nuts part, other parts need you provide with your Own Drawing. This kind of shaft better send us with your own 3D drawing for in case in the making
Quality Policy
All the parts manufactured 100% inspection from OQC before shipping.
Sample
Sample before goods need sample cost, also with the Mold cost; Pre-production sample didn't need sample cost, but count in goods cost
Packaging
Normal packing, then put in a box, and with Pallet (Custom packing ways accept, if you have this kind of needs, let me know)
Lead time
Need at least 30 days for goods production

2. Production Process

3. Inspection

4.About Our Company:

Shenzhen Bailian Hardware Co., Ltd. is a professional foreign import and export trading company which was founded on the basis of integrating advantages of many enterprises.

With imported automatic lathes,CNC lathes,CNC machining centers,stamping machines and cold heading machines,also  the strict quality management system,we keep improving our product quality and finding most fitting fastening solution to help our customers for one-stop buying with the optimum cost of maximum flexibility.


5.FAQ:

1. Q: How could you ensure the quality of your product?

A: 100% inspection during production.

Our products are certified to ISO9001, RoHS international quality standards.


2. Q: What's the delivery time?

A: General speaking the time is 15-30 days after confirmed every details.


3. Q: What's your packing?

A:  Usually PE bag,Small box,Plasitc box .

We also can pack products according to your requirement.


Welcome for any consult, also welcome to come to our factory visit, third party checking with our factory also welcomed

RELATED PRODUCTS